PRISM
workspace-state.md
PRISM Workspace State
Phase
Candidate full orchestration pilot.
Health
Yellow.
The vault has strong architecture and pipeline material, but the current app/repo state needs verification before execution.
Current Objective
Determine whether PRISM should become the first full My OS project-team pilot.
Known Current Claims To Verify
- FastAPI + Temporal backend exists.
- Next.js frontend with copilot UI exists.
- 7 of 20 modules were registered in v2 at the time of capture.
- Original 20+ skill audit pipeline is production-grade but fragile.
Next Actions
| Action | Owner | Status |
|---|---|---|
| Verify current PRISM code/app state | Architect | Pending |
| Summarize existing pipeline and gaps | Research Orchestrator | Pending |
| Draft project overview for ELT review | Athena + PM | Pending |
| Decide pilot scope | Arijit + Athena | Pending |